(919) 330-1230

Van Alen

JSmith Civil got down and dirty at 555 Mangum —prepped the site for the highly anticipated mixed-use development. The 555 Mangum Street project is located on a tight site—lodged between the Durham Freeway and downtown. Project Scope: Infrastructure includes grading and exporting 80,000 cy of dirt, shoring, and underground utilities including storm water and sanitary sewer for an entire city block in downtown Durham.

Location: Durham, NC
Acreage: 5 Acres